Font Size: A | A | A

Oswegatchie River

Description

This 30MW project owned by Erie Boulevard Hydropower, is located in upstate New York. Operations began in 1913 but was halted from 1992 to 2002 due to collapse of the wooden intake flume. A reconstruction allowed the project to operate again after 2002.

The current operating license expires on Dec 31, 2012. 

Issues

Map

Milestones

News Related to Oswegatchie River

Pre-Application Document filed for Oswegatchie River Hydro Project

By: Rupak Thapaliya  Tuesday January 8, 2008
Region: Great Lakes
Key Words: Oswegatchie River | PAD
States: New York

Erie Boulevard hydropower, L.P. has submitted its Pre-Application Document for the Oswegatchie River Hydroelectric Project, the license for which expires in December 31, 2012.