FERC Notices In Federal Register

Subscribe to FERC Notices In Federal Register feed FERC Notices In Federal Register
Justia Federal Register Feed - Federal Register Recent Federal Regulation Documents: 3347 results - showing 1 through 50
Updated: 38 min 22 sec ago

Notice - Alabama Power Company: Notice Soliciting Scoping Comments

10 hours 32 min ago
Doc No: 2014-18010] DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 2203-015] Alabama Power Company: Notice Soliciting Scoping Comments Take notice that the following hydroelectric application has been filed

Notice - Woodland Pulp, LLC: Notice of Application Accepted for Filing, Soliciting Motions To Intervene and Protests, Ready for Environmental Analysis, and Soliciting Comments, Recommendations, Preliminary Terms and Conditions, and Preliminary Fishway...

10 hours 32 min ago
, and Soliciting Comments, Recommendations, Preliminary Terms and Conditions, and Preliminary Fishway Prescriptions Take notice that the following hydroelectric application has been filed with the Commission and is available for public inspection

Notice - Alamo Dam Hydro Partners: Notice of Preliminary Permit Application Accepted for Filing and Soliciting Comments, Motions to Intervene, and Competing Applications

Tue, 2014-07-29 03:00
, and Competing Applications On May 6, 2014, Alamo Dam Hydro Partners filed an application for a preliminary permit, pursuant to section 4(f) of the Federal Power Act (FPA), proposing to study the feasibility of the Alamo Dam Hydroelectric Project (Alamo

Notice - FFP Missouri 12, LLC; Notice of Application Accepted for Filing and Soliciting Motions To Intervene and Protests

Tue, 2014-07-29 03:00
that the following hydroelectric application has been filed with the Commission and is available for public inspection. a. Type of Application: Original Major License. b. Project No.: 13755-002. c. Date Filed: February 3, 2014. d. Applicant: FFP

Notice - FFP Missouri 16, LLC; FFP Missouri 15, LLC; Solia 8 Hydroelectric, LLC; FFP Missouri 13, LLC; Solia 5 Hydroelectric, LLC; Solia 4 Hydroelectric, LLC: Notice of Application Accepted for Filing and Soliciting Motions To Intervene and Protests

Tue, 2014-07-29 03:00
Doc No: 2014-17758] DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 13753-002, 13771-002, 13763-002, 13766-002, 13767-002] FFP Missouri 16, LLC; FFP Missouri 15, LLC; Solia 8 Hydroelectric, LLC; FFP Missouri 13, LLC

Notice - FFP Missouri 5, LLC et al.; Notice of Application Accepted for Filing and Soliciting Motions to Intervene and Protests

Tue, 2014-07-29 03:00
to Intervene and Protests FFP Missouri 5, LLC Project No. 13757-002 FFP Missouri 6, LLC Project No. 13761-002 Solia 6 Hydroelectric, LLC Project No. 13768-002 Take notice that the following hydroelectric applications have been filed with the Commission

Notice - Idaho Water Resources Board; Notice of Preliminary Permit Application Accepted for Filing and Soliciting Comments, Motions To Intervene, and Competing Applications

Thu, 2014-07-24 03:00
, and Competing Applications On March 24, 2014, the Idaho Water Resource Board filed an application for a preliminary permit, pursuant to section 4(f) of the Federal Power Act (FPA), proposing to study the feasibility of the Weiser-Galloway Hydroelectric

Notice - Yuba County Water Agency Hydro Sierra Energy LLC; Notice of Application for Transfer of License and Soliciting Comments and Motions To Intervene

Thu, 2014-07-24 03:00
To Intervene On July 9, 2014, Yuba County Water Agency (transferor) and Hydro Sierra Energy LLC (transferee) filed an application for transfer of license of the Deadwood Creek Hydroelectric Project located on the Deadwood Creek in Yuba County

Rule - Format and Dimensions of Maps and Drawings Required by the Commission's Hydropower Program

Thu, 2014-07-24 03:00
processes. Annually, the Commission receives aperture card filings and drawings from approximately 160 licensees/exemptees (out of 1,660 hydroelectric licensees/exemptees). This Final Rule reduces the economic burden of submitting microfilm copies

Rule - Generator Relay Loadability and Revised Transmission Relay Loadability Reliability Standards

Wed, 2014-07-23 03:00
, 2013). \48\ 13 CFR 121.201, Sector 22, Utilities. Hydroelectric power generation, at 500 employees; Fossil fuel electric power generation, at 750 employees; Nuclear power generation, at 750 employees; Other electric power

Notice - Notice of Intent To File License Application, Filing of Pre-Application Document, and Approving Use of the Traditional Licensing Process

Mon, 2014-07-21 03:00
Association, Inc. e. Name of Project: Uintah Hydroelectric Project. f. Location: On Uinta River in Duchesne County, Utah. The project is located on federal lands of Ashley National Forest and tribal lands of the Uintah and Ouray Native American

Notice - Notice of Intent To File License Application, Filing of Pre-Application Document, and Approving Use of the Traditional Licensing Process

Mon, 2014-07-21 03:00
Electric Utilities. e. Name of Project: Municipal Hydroelectric Project. f. Location: The Municipal Hydroelectric Project is located on the Little River near the city of Radford, in Montgomery and Pulaski counties, Virginia. The project does

Notice - Sunshine Act Meeting Notice

Tue, 2014-07-15 03:00
.................................... P-12532-005................ Pine Creek Mine, LLC. H-4.................................... P-7019-061................. Eastern Hydroelectric Corporation. Certificates C-1

Notice - City of Wadsworth, Ohio; Notice of Availability of Environmental Assessment

Tue, 2014-07-15 03:00
for the 50- megawatt Robert C. Byrd Hydroelectric Project, (RC Byrd Project or project), located on the Ohio River at the U.S. Army Corps of Engineers' (Corps) Robert C. Byrd Locks and Dam (RC Byrd Locks and Dam), approximately 12.7 miles south

Notice - I-MAXMAT Corporation; Ampersand Collins Hydro, LLC; Notice of Transfer of Exemption

Tue, 2014-07-15 03:00
]] the Chicopee River in Hampden County, Massachusetts. The transfer of an exemption does not require Commission approval. \1\ 26 FERC ] 62,112, Order Granting Exemption from Licensing of a Small Hydroelectric Project of 5 Megawatts or Less. 2

Notice - Stillwater Hydro Associates, LLCGR Catalyst One, LLC; Notice of Application for Transfer of License and Soliciting Comments and Motions To Intervene

Tue, 2014-07-15 03:00
To Intervene On June 19, 2014, Stillwater Hydro Associates, LLC (transferor) and GR Catalyst One, LLC (transferee) filed an application for transfer of license of the Stillwater Hydroelectric Project located on the Hudson River in Saratoga

Notice - Commission of Public Works of the City of Spartanburg, South Carolina; Notice of Intent To File License Application, Filing of Pre-Application Document, and Approving Use of the Traditional Licensing Process

Mon, 2014-07-14 03:00
. d. Submitted By: Commission of Public Works of the City of Spartanburg, South Carolina (Spartanburg Water System). e. Name of Project: Bowen Hydroelectric Project. f. Location: At the existing Lake Bowen Dam on the South Pacolet River

Notice - Commission of Public Works of the City of Spartanburg, South Carolina; Notice of Intent To File License Application, Filing of Pre-Application Document, and Approving Use of the Traditional Licensing Process

Mon, 2014-07-14 03:00
. d. Submitted By: Commission of Public Works of the City of Spartanburg, South Carolina (Spartanburg Water System). e. Name of Project: Blalock Hydroelectric Project. f. Location: At the existing Lake Blalock Dam on the Pacolet River

Notice - Roaring Springs Ranch; Notice of Preliminary Determination of a Qualifying Conduit Hydropower Facility and Soliciting Comments and Motions To Intervene

Mon, 2014-07-14 03:00
power and uses for such generation only the hydroelectric potential of a non-federally owned conduit. FPA 30(a)(3

Notice - Commission of Public Works of the City of Spartanburg, South Carolina; Notice of Intent To File License Application, Filing of Pre-Application Document, and Approving Use of the Traditional Licensing Process

Mon, 2014-07-14 03:00
. d. Submitted By: Commission of Public Works of the City of Spartanburg, South Carolina (Spartanburg Water System). e. Name of Project: Fingerville Hydroelectric Project. f. Location: At the existing Fingerville Dam on the North Pacolet

Pages