FERC Notices In Federal Register

Subscribe to FERC Notices In Federal Register feed FERC Notices In Federal Register
Justia Federal Register Feed - Federal Register Recent Federal Regulation Documents: 3632 results - showing 1 through 50
Updated: 48 min 13 sec ago

Notice - City of River Falls, Wisconsin; Notice of Application Accepted for Filing, Soliciting Comments, Motions To Intervene, and Protests

Thu, 2015-08-27 03:00
notice that the following hydroelectric application has been filed with the Commission and is available for public inspection: a. Application Type: Extension of license term. b. Project No.: 10489-014. c. Date Filed: July 6, 2015. d

Notice - West Valley Water District; Notice of Preliminary Determination of a Qualifying Conduit Hydropower Facility and Soliciting Comments and Motions To Intervene

Thu, 2015-08-27 03:00
Regulatory Efficiency Act of 2013 (HREA). The proposed Roemer Water Filtration Facility Hydroelectric Project would have an installed capacity of 484 kilowatts (kW) and would be located on the existing West Valley Water District's raw water 30-inch

Notice - Energy Resources USA Inc.; Notice of Preliminary Permit Application Accepted for Filing and Soliciting Comments, Motions To Intervene, and Competing Applications

Thu, 2015-08-27 03:00
Hydroelectric Project No. 14687-000, to be located at the existing Mississippi River Lock and Dam No. 11 on the Mississippi River, near the City of Dubuque, in Grant County, Wisconsin. The Mississippi River Lock and Dam No. 11 is owned by the United States

Notice - Curtis/Palmer Hydroelectric Company, LP; Notice of Application Accepted for Filing, Soliciting Comments, Motions To Intervene, and Protests

Wed, 2015-08-19 03:00
.gpo.gov] [FR Doc No: 2015-20465] DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 2609-044] Curtis/Palmer Hydroelectric Company, LP; Notice of Application Accepted for Filing, Soliciting Comments, Motions To Intervene

Notice - PacifiCorp; Notice of Intent To File License Application, Filing of Pre-Application Document, Approving Use of the Alternative Licensing Process, and Requesting Cooperating Agency Status

Wed, 2015-08-19 03:00
By: PacifiCorp. e. Name of Project: Weber Hydroelectric Project. f. Location: On the Weber River, in Weber, Davis, and Morgan Counties, Utah. The project occupies 11.4 acres of United States lands administered by the U.S. Forest Service. g

Notice - Aquenergy Systems, LLC; Notice of Intent To File License Application, Filing of Pre-Application Document, and Approving Use of the Traditional Licensing Process

Thu, 2015-08-13 03:00
of Project: Fries Hydroelectric Project. Location: On the New River, in Grayson County, Virginia. No federal lands are occupied by the project works or located within the project boundary. Filed Pursuant to: 18 CFR 5.3 of the Commission

Notice - Liquid Sun Hydro, LLC; Notice of Preliminary Permit Application Accepted for Filing and Soliciting Comments, Motions To Intervene, and Competing Applications

Tue, 2015-08-11 03:00
Applications On May 1, 2015, the Liquid Sun Hydro, LLC, filed an application for a preliminary permit, pursuant to section 4(f) of the Federal Power Act (FPA), proposing to study the feasibility of the Bear Creek Hydroelectric Project (Bear Creek

Notice - Wilkesboro Hydroelectric Company; Notice of Application Accepted for Filing, Soliciting Comments, Motions To Intervene, and Protests

Tue, 2015-08-11 03:00
.gpo.gov] [FR Doc No: 2015-19693] DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No., P-12642-007] Wilkesboro Hydroelectric Company; Notice of Application Accepted for Filing, Soliciting Comments, Motions To Intervene, and Protests

Notice - Eugene Water & Electric Board; Notice Soliciting Comments on Request for Stay of Licensing Decision

Tue, 2015-08-11 03:00
Water & Electric Board (EWEB), licensee for the Carmen-Smith Hydroelectric Project (P-2242) located on the McKenzie River in Lane and Line Counties, Oregon, requested that the Commission: (1) Delay acting on its license application until at least

Notice - Murphy Dam, LLC; Notice Granting Late Intervention

Mon, 2015-08-10 03:00
to study the feasibility of the Murphy Dam Hydroelectric Project No. 14670. The proposed project would be located on the Connecticut River, near Pittsburg, Coos County, New Hampshire. The notice established June 20, 2015, as the deadline to file

Notice - Coleman Hydro, LLC; Notice of Availability of Draft Environmental Assessment

Mon, 2015-08-10 03:00
and the Federal Energy Regulatory Commission's (Commission) regulations, 18 CFR part 380 (Order No. 486, 52 FR 47897), the Office of Energy Projects has reviewed the application for an original license to construct the Coleman Hydroelectric Project, located

Notice - Malacha Hydro Limited Partnership and Juniper Ridge Ranches, Inc.; Notice of Application Accepted for Filing and Soliciting Comments, Motions To Intervene, and Protests

Fri, 2015-08-07 03:00
To Intervene, and Protests Take notice that the following hydroelectric application has been filed with the Commission and is available for public inspection: a. Application Type: Request to stay requirements of article 409 of project license. b

Notice - Public Utility District No. 2 of Grant County; Notice of Application and Soliciting Comments, Motions To Intervene, and Protests

Fri, 2015-08-07 03:00
notice that the following hydroelectric application has been filed with the Commission and is available for public inspection: a. Application Type: Recreation resources management plan amendment pertaining to recreation facilities and amenities

Notice - Grand River Dam Authority; Notice of Application for Temporary Variance and Soliciting Comments, Motions To Intervene, and Protests

Thu, 2015-08-06 03:00
Take notice that the following hydroelectric application has been filed with the Commission and is available for public inspection: a. Application Type: Temporary variance from the Article 401 reservoir elevation rule curve in order to keep

Notice - Erie Boulevard Hydropower, L.P.; Notice of Availability of Environmental Assessment

Wed, 2015-08-05 03:00
Hydroelectric Project, located on the Salmon River, near the Town of Malone, in Franklin County, New York. Commission staff prepared an Environmental Assessment (EA) which analyzes the potential environmental effects of the project and concludes that issuing

Notice - Crown Hydro, LLC; Notice of Application Accepted for Filing, Soliciting Comments, Motions To Intervene, and Protests

Wed, 2015-08-05 03:00
that the following hydroelectric application has been filed with the Commission and is available for public inspection: a. Type of Proceeding: Amendment of License. b. Project No.: 11175-025. c. Date Filed: April 30, 2015. d. Licensee: Crown Hydro

Notice - L.S. Starrett Company; Notice of Application Accepted For Filing, Soliciting Comments, Motions To Intervene, And Protests

Tue, 2015-08-04 03:00
notice that the following hydroelectric application has been filed with the Commission and is available for public inspection: a. Type of Application: Incorporation of modified 30(c) condition 5 into Appendix A and B of the project exemption order

Notice - Town of Grand Lake, Colorado; Notice of Preliminary Determination of a Qualifying Conduit Hydropower Facility and Soliciting Comments and Motions To Intervene

Tue, 2015-08-04 03:00
for such generation only the hydroelectric potential of a non- federally owned conduit FPA 30(a)(3)(C)(ii), as amended by HREA... The facility has an installed capacity that does

Notice - Garkane Energy Cooperative, Inc.; Notice of Application Accepted for Filing, Soliciting Comments, Motions To Intervene, and Protests

Fri, 2015-07-31 03:00
notice that the following hydroelectric application has been filed with the Commission and is available for public inspection: a. Type of Application: Request for Amendment of License. b. Project No.: 2219-046. c. Date Filed: June 29, 2015

Notice - Sweetwater Authority; Notice of Preliminary Determination of a Qualifying Conduit Hydropower Facility and Soliciting Comments and Motions To Intervene

Wed, 2015-07-29 03:00
Efficiency Act of 2013 (HREA). The proposed Perdue Water Treatment Plant Hydroelectric Project would have an installed capacity of 700 kilowatts (kW) and would be located on San Diego County Water Authority's existing raw water Pipeline 3, which carries

Pages