Font Size: A | A | A

4.2.7 Proposed Study Plan

Within 45 days of the same deadline, the licensee must file a proposed Study Plan.1 This must identify the studies the licensee proposes to undertake and otherwise respond to each timely study request. The plan must show that each proposed study, or each rejection of a study request, complies with the study criteria discussed in Section 4.2.5.2 In other words, the licensee, like a commenter, must address the utility of each study for the licensing decision, as well as cost. In addition, the plan must include a detailed description of the scope, method, and schedule of each study and must provide for continuing consultation with participants and progress reports.3

 

  1. See 18 C.F.R. § 5.11(a).

  2. See 18 C.F.R. § 5.11(d).

  3. 18 C.F.R. § 5.11(c).