Font Size: A | A | A

5.2.3 Study Plan

The licensee must publish a Study Plan. The plan must document the results of consultation, including the basis for rejection or modification of any study request.

This step is different than the ILP in several critical respects. The OEP Director does not review or approve the Study Plan, and OEP staff do not participate in the plan development. Further, NEPA scoping is not concurrent with study plan development and instead commences after application filing.