Merced

Font Size: A | A | A

Panel Recommends Studying Downstream Impacts in Merced River Relicensing

By: Rupak Thapaliya  Wednesday December 9, 2009

A panel formed to investigate the study related disputes in the relicensing of Merced River projects has found that FERC erred in limiting the geographic area which needed to be studied for impacts from the project.