News

Agreement To Restore Fisheries at Sullivan Creek and Continue Generation at Boundary Project

Keywords: Region: States:
Coalition members American Whitewater, Selkirk Conservation Alliance, and The Lands Council have signed two settlement agreements that call for continued operation of Boundary Dam on the Pend Oreille River, enhanced operation of Sullivan Dam on the natural Sullivan Lake, and the removal of Mill... read more

DOI, DOE and Army Corps Sign a MOU: Federal Agencies To Look at Basin-wide Assessment for Hydropower Development

Keywords: Region:
In what seems like a progress from conventional ways of looking at hydropower, federal agencies that own and operate hydropower projects around the country are collaborating to find ways to increase hydropower generation while at the same time protecting the non-power interests of the basin.The... read more

Staff Recommend Licensing of Saluda Hydro Project In South Carolina

Keywords: Region: States:
The FERC staff issued a draft Environmental Assessment (DEA) today for the 207.3 MW Saluda hydroelectric project on the Saluda River in Lexington, Richland, Newberry, and Saluda counties, South Carolina.The EA recommends the Commission to issue a license for the project as recommended by staff... read more

PG&E Gets a Green Light for Removal of Wildcat Dam

Keywords: Region: States:
PG&E has received FERC approval for its plan to decommission the Wildcat dam, a part of the Battle Creek hydroelectric project (P-1121). According to the “Wildcat Dam Decommissioning Plan,” removal will happen between May 1 and September 1. They also plan to demolish the Wildcat... read more

LaFleur is President Obama’s Pick for FERC Commissioner

Keywords: Region:
President Obama has announced his intent to nominate Cheryl A. LaFleur as the Commissioner of FERC and reappoint Philip D. Moeller for another term.If confirmed by the Senate, LaFleur would fill the position left vacant after Suedeen Kelly left the Commission earlier this year.According to the... read more

More Transparency Needed in Green Pricing Programs

Keywords: Region:
A recent study by the HRC has revealed lack of transparency in green-pricing programs offered by utilities around the country.In 2008, about 850 electric utilities, a quarter of the electric utilities in the United States, offered green-pricing programs and the trend is growing. However,... read more

Orrville Surrenders Application Before FERC

Keywords: Region: States:
The City of Orrville, OH, has surrendered its license for the Pike Island hydropower project before FERC.The project, authorized for 49.5 MW and never constructed, would have been located at U.S. Army Corps of Engineers’ Pike Island Locks and Dam on the Ohio River in Ohio County, West... read more

More Hydropower Projects Seek LIHI Certification

Keywords: Region: States:
The last day of 2009 saw seven hydropower projects filing their application for certification with the Low Impact Hydropower Institute. In 2009 alone, the Institute issued certifications for nine projects throughout the country. So far, there are 46 LIHI certified projects in 24 states.Of the seven... read more

Snohomish County Eyes to Build Tidal Project

Keywords: Region: States:
The Snohomish County PUD No. 1 in Washington has further advanced in its intent to build and operate a tidal energy project in the Admirarty Inlet. Earlier this week, the PUD filed its draft license application with FERC.The proposed Admiralty Inlet Pilot Tidal Project (P-12690) would be located on... read more

John Norris to Join FERC

Keywords: Region:
The Senate, last Thursday, confirmed John Norris to be the newest member of the Federal Energy Regulatory Commission.Norris is currently serving as chief of staff for Secretary of Agriculture Tom Vilsack. He served as the chairman of the Iowa Utilities Board from 2005 to 2009. He has also served as... read more

Pages