AK

Blind Slough P-201

General information

Waterway  Blind River
 Crystal Creek
Current status   Active license 
Type of facility Conventional Hydro
Mode of hydropower generation Peaking
Type of permit FERC License

FERC information

FERC docket # P-201
FERC project name Blind Slough
Permit issued 8/22/03
Permit expiration 11/8/34

Ownership and operation

Owner City of Petersburg
Owner type Publicly Owned Utility
Year first online (conventional hydro) 1954
Transmission or distribution system owner Petersburg Borough - (AK)

Power and generating capacity

Number of units 2
Total capacity from hydraulic turbine-generator units within each plant 1.6 MW
Average annual net hydropower generation 11,317.6 MWH

Is there something you’d like to add or correct? Please let us know.