Tippy P-2580
General information | |
Waterway |
Manistee River |
Current status | Active license  |
Type of facility | Conventional Hydro |
Mode of hydropower generation | Run-of-river |
Type of permit | FERC License |
FERC information | |
FERC docket # | P-2580 |
FERC project name | Tippy |
Permit issued | 7/10/94 |
Permit expiration | 6/26/34 |
Ownership and operation | |
Owner | Consumers Energy Co |
Owner type | Investor-Owned Utility |
Year first online (conventional hydro) | 1918 |
Transmission or distribution system owner | ITC Transmission |
Power and generating capacity | |
Number of units | 3 |
Total capacity from hydraulic turbine-generator units within each plant | 20.1 MW |
Average annual net hydropower generation | 60,218.4 MWH |
- Two existing earth embankment dam sections
- An impoundment with storage area of 1,100 acre-feet
- A powerhouse containing 3 generating units
- Transmission facilities, and appurtenant facilities
- Stronach Dam, on the tributary Pine River which flows into the mainstem Tippy impoundment
For a detailed description of this project and the Hodenphyl project included in the Consumers Settlement Agreement, read this summary.
Is there something you’d like to add or correct? Please let us know.
News and updates
From Trout Unlimited4/4/2024
Klamath Reservoir Drawdowns: Short-term Costs for much larger long-term gains
From American Whitewater3/28/2024
Wells River (VT) Whitewater Access to be Improved under New FERC License